Tips for the game Dungeons & Dragons. Chapter 3: Resurrection of Darrok #001

Basic quests:

1 - Open the entrance to the tomb of Darrok
1a - Destroy the dark near the statue of a black dragon
1b - Destroy the dark near the statue of a green dragon
1C - Destroy the dark near the statue of the Red Dragon
2 - Find the last refuge of Darrok
3 - invasion of the eye tyrant

Side quests:

1 - Call of the coaching turtle
1a - release spitting turtles
1b - destroy the invaders
2 - Investigate the keeper of the hive
2a - destroy the keeper of the hive
2B - Return to the Horseman of Pterenodon
3 - bonus - people
4 - bonus - gentle brother
5 - chest of obsidian monk
5a - get a blood sample of the monk
5b - Open the chest
6 - Reply to the Dragon Spirit
6a - sacrifice your birth
6b - suppress the uprising of Lizardfolov
6C - Destroy the traitors of Lizardfolov
6D - destroy giant wire OS
6e - collect giant wire OS

In search of help, desperate Lizardfolks decide to revive their largest champion, Darrok. Unfortunately, the holy lands, where the place of his last rest was hidden, were defiled by invaders. This activated the ancient spell and caused the closure of the entrances to the tomb. Only by defeating the enemies, you can reach the remnants of Darrok.

At first, I propose to improve the walls of our camp and train archers - one of the Umbragen bases is located in the northeast. This plateau and flying detachments attack us, so combinations of archers and towers will be quite enough to protect against them. After the construction of defense and improving our army, we went east to meet with a teleport after a while. Its other end is on the basis of Umbragen, so it is not yet available. Continuing the march to the east, we are faced with the “troglody Herler”, which calls for us to free the turtles locked by Umbragen and destroy the post of dark elves. Therefore, we move north to get to the locked turtles and their executioners. We agree with them and destroy the fence so that the turtles can return to our coach. Now the time has come for the Umbragen post located in the east. After a heavy fight and victory over the enemy, it turns out that we destroyed the guards of the statue of a black dragon (a hint - if the black claw is our champion, we get an additional task. We must choose one of the possible options - devote our blood (blue stone) or our subordinates ( Red stone, we must collect 4 of them in a circle). We will get an artifact of the champion in both cases.). Now we can return to the guard of turtles, take the prize and find out the methods of teaching these creatures.

Time for the next statue. We move to the northwest. We are faced with strong enemy resistance and strange slots attacking our units from the Earth. The fight against them is meaningless, because after a while they reach themselves and attack again. Thus, we go to a more distant path to the village of Pterenodon Raiders. They ask us to go down to the ground and find the sources of strange attacks. The entrance is located in the west. Find best Training providers in Africa on https://learnician.com/ with real reviews.

Please Submit a job scope to schedule your trimarc install or delivery.

Receiving

Please notify us via fax at (770) 447 – 9368 or email at [email protected] of shipments you are scheduling for us, identifying the carrier and shipper prior to the shipment arriving at our location.

Send all LTL, truckload and UPS/Fed-Ex shipments to:

YOUR NAME – PROJECT/SIDEMARK
C/O TriMarc Installation
5952 Peachtree Industrial Blvd., Suite 2
Norcross, GA 30071

All LTL and truckload shipments must call us at (770) 447-9308, 24 hours prior to delivery.

Customer Pick-ups: Monday – Friday, 8:00AM – 3:30PM (Closed 12PM – 1:00PM).Minimum 24-hour notice for customer pick-up.

Receiving Rates:

  • Inspection Fee:$10 per item
  • Receiving Fee:$10 per item
  • Uncrating Inspection Charge: $35
  • Storage Rates:$2.00 per square ft. (first 60 days FREE), assessed on first of month

If TriMarc Installation pays COD Freight, a 15% handling fee will apply.

full-service "white-glove" installation and logistics
full-service "white-glove" installation and logistics

Customer Pickups

Customers may pick up items Monday – Friday from 8:00AM until 3:30PM

Minimum 24-hour notice for customer pick-up.

$10/piece dock charge for pick-up by another carrier or customer pick-up.

TriMarc is not responsible for damages incurred due to improper loading or type of vehicle used.

Installation

If you need specialized installation services for your project, look no further than TriMarc Installation. We have the experience to get the job done right, on time and on budget.

If purchasing through ADG Interiors, a brand of Atlanta Design Group:

  • For all ADG Home orders over $5,000 receive one FREE hour of installation,
  • $15,000 receive two Free hours of installation
    The following terms apply:

    • The one hour cannot be split up.
    • Balance of invoice must be paid in full before TriMArc can schedule and install.
    • If client elects to pick up their ADG Home order instead of taking advantage of the installation, the customer pick-up will be FREE. For ADG Home orders under $5,000, there is a $10.00 pick-up fee for each piece or carton.
  • Free receiving will be provided:Upon receipt, we will open, inspect and blanket wrap each piece, remove cartons and await further instructions. A Receiving Report of the pieces received will be faxed or emailed to the client within eight business hours of receipt. We do this for non ADG Home items too.

Other Charges and Fees

  • Minimum Hours: One hour minimum per installation project
  • Fuel Charge: None
  • Assembly Fees: See hourly rates above
  • Trip Charge: $35 flat fee per trip within the metro Atlanta area
  • Out-of-State Installations: Please call us at (770) 447-9308 for a quote
  • Art Installations: When art is purchased from Patrick Allen Art, a Brand of ADG, the installation fee is reduced to $50/hour for a 1-man crew or $70/hour for a 2-man crew; otherwise, the standard hourly rates apply.
  • Cancellation Fee:A $100.00 cancellation fee per scheduled hour for installations, deliveries, or on-site pickups if cancelled within 36 BUSINESS hours of scheduled appointment.
  • Crating Fees: $75.00 per crate

Installation and Drive Time Rates

Regular Overtime (after 8 hours)
One man and a truck: $80/hour $110/hour
Two men and a truck: $120/hour $160/hour
Three men and a truck: $155/hour $210/hour
Four men and a truck: $190/hour $255/hour
Four men and TWO trucks: $220/hour $285/hour
Five men and TWO trucks: $260/hour $335/hour
Six men and TWO trucks: $295/hour $380/hour
Additional men: +$40/hour +$50/hour
Additional truck: +$30/hour +$30/hour
full-service "white-glove" installation and logistics
full-service "white-glove" installation and logistics

Freight Service

We have negotiated competitive freight rates with regional and national freight carriers. Take advantage of our discounts by using our freight carriers to ship. We can arrange to ship your items to and from our facility. TriMarc Installation is invoiced directly eliminating the need for CODs. Please visit our Contact Us page or call us at (770) 447 – 9308 for your next shipment.

Delivery & Pickup Rates:

  • For Trips Inside of I-285:$65 for up to three items $10 for each additional items
  • For Trips Outside of I-285:$95 for up to three items $10 for each additional items

Furniture Repair

It happens, and we can help!

  • On-Site Repairs
  • Furniture Repairs
  • Structural Repair
  • Finish Repairs
  • Color Matching
  • Scratch Repair
  • Antique Restoration & Refinishing

Crypton Fabric Protection Service:

Chairs: $20 – $59
Sofas: $79 – $89
Sectionals: $169 – $207

Please call (770) 447-9308 to learn about our furniture repair service.

full-service "white-glove" installation and logistics
TriMarc Installation
3571c901c97de6569aa90f523fa81489